CHESTER

01244 565900

LIVERPOOL

0151 332 5900

SHREWSBURY

01743 293000

Case Studies

Contact Us

Case Study – CC Residential Block Management in Wrexham

Project Objective: Review spending and value for money
Location: Wrexham

We were approached by directors of CC who had experienced poor service from a large UK block management agent who was both RICS and ARMA affiliated. With 89 apartments at the development, the management company was being run at a loss, had very poor housekeeping and residents had trouble selling and letting apartments. We were able to fully demonstrate how our attentive management style and culture would benefit the new client and the lessees who had experiences of our services on other local developments. This provided them with the confidence they needed to progress with the change of block managing agent.

Initially we suggested increasing the number of directors to allow for one director per block. This would allow constant feedback to Paramount regarding the individual blocks via that director, which would allow us to react more quickly should any issues arise.

After a full financial review of expenditure, insurance claims, outstanding invoices and the maintenance programme, we sat down with directors and put forward a plan which would exceed their expectations and still come in at the same annual service charge they were already paying.

cc1

The Expectations

With a plan in place the target was to meet the commitments agreed with the directors and come in on budget.

Our Solution

Paramount carried out a full audit of the last 12 months costs. All lease and budget needs were reviewed along with the resident’s requirements.

Paramount were able to demonstrate to directors that considerable savings were achievable providing immediate savings of 25% against the existing and previous budgets. The main areas or reduction were:

Building Insurance saving – Year 1 – 20%

Electricity reduced by 16%

Reserve fund allocation 15% of budget (without increasing demands)

Proactive property maintenance and contractor management 25%

Results, Expectations and Savings

Paramount audited the development and provided alternate and cost-effective solutions to reduce costs and improve efficiency and cash flow.

Building Insurance was proactively managed to reduce unnecessary claims.

A full external painting plan allowed a contractor to work using quality traditional standards, two days per week during the summer. The total cost was only 30% of the figure previously charged by the existing block management company, who were using contractors from Birmingham who commuted daily (arriving at 10 and finishing at 2).

As part of our Health & Safety directive we updated, to LED, all the internal lights and sensors together with replacing all (39) external bollard lights.

Day to day maintenance was introduced to ensure repairs were dealt with swiftly and good standards could be maintained whilst operating within budget.

All contracts were reviewed, with new contractors, suppliers and utilities companies chosen.

Thanks to Paramount’s proactive management and keen attention to detail, they successfully increased the reserve fund allocation from 15% last year to 23% this year, all without raising the annual service charges.

The development is a desirable place to live with high rental yields and strong sales. Ideally located in Wrexham, this is now a highly sought-after location.

Our aim at Paramount is to save you much of the hassle and frustration that can come with many block estate management companies, and provide you with confidence and reassurance instead.

Get in touch

Contact Form

FREE Site Appraisal

Arrange your free site appraisal with us and you could reduce your annual costs by up to 35%!

Call us for more info on

01244 565900

0151 332 5900

01743 293000